DOW-UAP-D187
DIA Talking Paper for Senator Reid Engagement, January 2009
- Agency
- Department of War
- Format
- Document, 1 page
- Document date
- 1/2/09
- Place
- Washington, D.C. The document's own place: it reports no single incident
- Released
- Release 08, November 20, 2026
- Source
- war.gov
- Topics (archive tags)
- AAWSAP / AATIP
Description from war.gov
Page 1
UNCLASSIFIED/A9UO U-326-09/DWO 02 January 2009 Talking Paper for the Director SUBJECT: (U) Senator Reid Visit to Director, DIA, 0S January 2009 1. (U) PURPOSE: To provide LTG Maples with the current status of the Advanced Aerospace Weapon System Applications contract should Senator Reid raise the topic. 2. (U/45060) BACKGROUND: Senator Inouye (D-HI) and Senator Reid (D-Nev) sponsored language in the July 2008 Supplemental Appropriation bill for DIA to investigate foreign advanced aerospace weapon threats from the present out to 40 years in the future. Senator Reid has a deep interest in the potential threat posed by unconventional aerospace rechnologies; that is, technologies that are a radical departure to those used in current advanced aerospace vehicles. In response to this tasking, the Acquisition Support Division (DWO-3) published a request for proposals (RFP) on 18 August 2008. DIA received only one bid, from Bigelow Aerospace Advanced Space Studies (BAASS), in response to the RFP. DIA/AE and DIA/DWO determined that the proposal was responsive and the contract signed on 22 September 2008. Since the Director's meeting with Senator Reid on 13 November 2008, the following items have been completed per the contract. 3. (U) TALKING POINTS: • (U/4000) Program Management Plans. BAASS submitted the 12 technical area program management plans (PMPs) on 21 November 2008. • (Viteve) DWO-3 reviewed the PMPs and rated them as very good to excellent. D WO3 granted BAASS approval to proceed with the technical reports. • (U/59U€) BAASS will deliver to DIA approximately two detailed reports per technical area. The goal is for DWO to have all reports by the end of July 2009. • (U/POtO) Facility Clearance. The Defense Security Service conducted a site inspection on the BAASS facility on 17 December 2008. The inspection was completed satisfactorily and the facility clearance process is expected to be completed shortly. • (U/F0be) Contract is on track. The contract is currently proceeding on schedule and within cost. The technical reports will be under subcontract by February 2009 and completed by the end of July 2009. (U) Prepared by: 1843(a)(2) 1843(a)(2) Defense Warning Office, Acquisition Support Division (DWO-3), UNCLASSIFIED//FOtOThe text is machine-read (OCR) from the scan and can contain errors. The scan is the record.
Cite this page
U.S. Department of War. "DIA Talking Paper for Senator Reid Engagement, January 2009" (DOW-UAP-D187). PURSUE Release 08, U.S. Department of War, November 20, 2026. https://www.war.gov/medialink/ufo/docs-112026-release-08/DOW-UAP-D187-DIA_Talking_Paper_for_Senator_Reid_Engagement_January-2009.pdf. Declassified UAP, page 1, https://declassifieduap.org/r/dow-uap-d187-dia-talking-paper-for-senator-reid-engagement-january-2009?page=1. Accessed November 28, 2026.
Machine summary
Written by Claude Sonnet 5.5 (Anthropic) on November 25, 2026, from the full text of the record and war.gov's description. Checked against the record's full text on November 25, 2026. It is not part of the record and can contain errors; check it against the document.
This is a one-page talking paper for the Director, dated 02 January 2009, prepared by the Defense Warning Office, Acquisition Support Division (DWO-3). Its stated purpose is to give LTG Maples the current status of the Advanced Aerospace Weapon System Applications contract should Senator Reid raise the topic. It says Senators Inouye and Reid sponsored July 2008 supplemental appropriation language, that DIA received one bid, from Bigelow Aerospace Advanced Space Studies (BAASS), and that the contract was signed on 22 September 2008. Talking points say BAASS submitted 12 technical area program management plans on 21 November 2008, DWO-3 rated them very good to excellent, and the contract is on schedule and within cost, with reports expected by the end of July 2009.
Most frequent words
Select one to highlight it in the text above.