NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 99

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
99 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 99

Lovell Borman Lovell Borman Lovell CONFIDENTIA 89 the flight, down in the vicinity of my right foot in the center pedestal lower area there, around the cabin heat exchanger, we got a lot of condensation. It was very wet on the walls and the blotter paper was sopping wet, a radius of about 12 inches on the lower right pedestal, on my side. I do not know how it was on your side. It started getting wet on my side, the inboard. Yes, inboard side. That is the only place in the spacecraft that I noticed any condensation. As far as I know the evap- orator only operated during launch and the first orbit. We also had one other day when we woke up and were tumbling quite badly and the wall temperatures were 16 degrees to 20 degrees lower than we ever recorded them before. I suspect that the evaporator might have worked that night. We men- tioned this to the ground and...let's see, I have some notes on that. It probably got filled up from the moisture going into the system. This was noted in the data for the cabin temperature surveys also. I don't remember exactly what day it was, where we noticed this big change in temperature. It was about 5 or 6 days after the mission started, wasn't 1t?

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 99 of NASA-UAP-D021, as released by war.gov
Image from page 99 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 99, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/99. Accessed November 28, 2026.

This address shows page 99 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=99 opens the same page in the full reader. Both stay. How to cite.