NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 98

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
98 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 98

88 O2• We have already talked about the Co, partial pressure. It was below zero the entire flight except during tape dumps when it jumped up due to a glitch that the tape dump puts in the IM system. Radiator operation and configuration...We ran radiator on all the time except for two checks that were made. Actually when we opened circuited the fuel cells be- fore we brought them back on the line, we went to RADIATOR BYPASS twice. Then we went to RADIATOR BYPASS once when we wanted to get the water out of the ECS System. One time during the flight we were picking up water. This might be a good place to cover that. We were picking up water coming out of our suit inlet hose, in quite large quantities. We called the ground, and they suggested that perhaps the water boiler was not venting. They called up the procedure that included putting on evaporator heat, turning off the radia- tor and going to bypass on the radiators and rotating the spacecraft at 10 degrees per second. This threw out large amount of water and things got back to normal. later on in the flight we noticed the same thing, but we were busy align- ing the platform and other things and we did not want to setup roll-rates. All we did was put the suit coolant to warm and put both suit fans on and blew the water out of the system, and that worked also. We did notice that during

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 98 of NASA-UAP-D021, as released by war.gov
Image from page 98 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 98, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/98. Accessed November 28, 2026.

This address shows page 98 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=98 opens the same page in the full reader. Both stay. How to cite.