NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 42

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
42 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 42

32 -CONFID Lovell Borman Lovell Borman Lovell Borman Lovell inches in diameter at the exit from the water boiler vent. There were only two problems that we really had. There were the Fuel Cells and the two thrusters. We also had a cold Spacecraft. Yes, that is when we had that water boiler problem. Before that; the first time we woke up, it was 20 degrees colder inside. Oh yes, I'm sure what had happened during the night was that we vented the water boiler, used the water boiler. This is the day when we woke up and had such high rates on the S/C. We have all that in the cabin temperature survey. The wall temperature was 20 degrees lower. It was just freezing in there. 5.0 RETROFIRE 5.1 IR-2:00 Power Up and Alignment Checklist We had a slightly different procedure as far as retrofire goes. Powering up for it took two hours. The power up and alignment checklist was called up from the ground since we had open circuited two stacks. We turned our main batteries on and the squib batteries back on at TR minus two hours. During the flight they had powered us down on the squib batteries and put in the bus ties about the last week of the CONFIDE

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 42 of NASA-UAP-D021, as released by war.gov
Image from page 42 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 42, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/42. Accessed November 28, 2026.

This address shows page 42 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=42 opens the same page in the full reader. Both stay. How to cite.