NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 41

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
41 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 41

Borman Borman Lovell Borman Lovell Borman INFID ENTIAL 31 America. About the only area that stayed clear was North- west Africa. A lot of the experiments and a lot of the Apollo landmarks were shot because of clouds. On the 6 launch, the second time, we were able to track it. We were not able to pick up lift-off because of clouds again, but when it got to the con level, above the clouds, we were able to pick it up and we tracked it using IR until we couldn't see anymore. Even above the con level I think we were tracking the exhaust from the stage two en- gines using PULSE mode. I hope we got some good data on that. At 266:16 we really got cold; the suit inlet temperature dropped below 40 degrees and we started squirting water out of the suit inlet hoses. We informed Houston about this and they determined that the water boiler had frozen up and they recommended a procedure to clear it. We did this with Gemini 6 watching; essentially it involved putting the radiator to BYPASS and changing some switches. Evaporator heat on. Put the evaporator heat on and setting up to 10 degree per second roll rate. That's the picture you saw in the movies. It actually threw a lot of fuel out and a lot of water out. It left a glob of ice on the side of the S/C, about 10 CONFIDENTIA

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 41 of NASA-UAP-D021, as released by war.gov
Image from page 41 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 41, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/41. Accessed November 28, 2026.

This address shows page 41 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=41 opens the same page in the full reader. Both stay. How to cite.