NASA-UAP-D020

Gemini 5 Technical Debriefing, Part II, 1965, page 293

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
293 of 325
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 293

282 Conrad Cooper Conrad CONFIDENTIAL see what the actual time difference was. Maybe it was just us. They can ring that out real easy. We can improve the reentry on the simulator a little bit, it's different in this respect. Okay, Crew Station. I have the same comment that I made after Mercury on that. I think that it is just too bad that we can't have horizontal simulators be- cause that is exactly the way you are in orbit. You are not laying on your back, you are in a horizontal configuration. If your simulator ran horizontal you would be standing just like you would be in orbit. Orientation is entirely different. I compliment the Gemini crew station on the layout of the parameters that are displayed to you. I feel that there are some other parameters that I would like to have seen displayed in the spacecraft throughout the flight. As an example, I hate to rely on the ground for radiator temperatures or have them call me to heat up a cooling loop. That type of thing is an onboard function. It is very nice that the ground monitors and takes care of you. The spacecraft was extremely well layed out, and as we thought in the simulator it turned out to be true in flight. CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 293 of NASA-UAP-D020, as released by war.gov
Image from page 293 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part II, 1965" (NASA-UAP-D020). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D020_Gemini-5-Technical-Debriefing_Part2_1965.pdf. Declassified UAP, page 293, https://declassifieduap.org/r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965/p/293. Accessed November 28, 2026.

This address shows page 293 on its own; /r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965?page=293 opens the same page in the full reader. Both stay. How to cite.