NASA-UAP-D020

Gemini 5 Technical Debriefing, Part II, 1965, page 292

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
292 of 325
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 292

Cooper Conrad Cooper Conrad Cooper Conrad Cooper CONFID ENTIAL 281 in the ball park with the previous spacecraft. It had to be traveling right because as long as you keep your rates zeroed it is going to trim to its proper trim point. I agree with you completely. It seemed to me as though we trimmed a lot nose higher much earlier in the reentry than we did in the simulator. You have less nose up above the horizon for a longer period of time in the simulator than you do in the actual case. That was the only thing that seemed different about the reentry. It didn't concern me because I knew we were damped and trimed out okay. Yes, I knew we were in good shape, but it was a sig- nificant enough difference so as to be a glaring dif- ference with the simulator. I don't know whether it actually was the case or not, but the reentry seemed to go much faster than it did on the simulator. From Guidance Initiate to 100 000 feet, it seemed to pass at considerable less amount of time than it does in the simulator. Yes, it sure seemed to me like it did. That is some- thing I think we ought to have people check into to CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 292 of NASA-UAP-D020, as released by war.gov
Image from page 292 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part II, 1965" (NASA-UAP-D020). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D020_Gemini-5-Technical-Debriefing_Part2_1965.pdf. Declassified UAP, page 292, https://declassifieduap.org/r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965/p/292. Accessed November 28, 2026.

This address shows page 292 on its own; /r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965?page=292 opens the same page in the full reader. Both stay. How to cite.