NASA-UAP-D020

Gemini 5 Technical Debriefing, Part II, 1965, page 238

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
238 of 325
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 238

CONFIDENTIAL 227 of turning and I missed Agena BUS ARM EXPERIMENTS and I missed jettisoning the door on the cold IR. That's my fault and I jettisoned the door on the cold IR at 02 hours, 16 minutes, 15 seconds after liftoff. I started taking the first REP measure- ments and unfortunately it was at 2500 feet. I felt that it was still readable so that is where the data starts. We got some black sky along side the REP with the cold IR. The radiometric and IR spectrometer alinements were right on the button. So was the cold IR. We had no trouble with the power down procedures. It was very straightforward. We never did get to do the cryogenic gas lifetime updates. We never got the Milky Way with that cooled sensor. We did get the void black space with the cooled sensor. We got the Zodiacal light. We got most of the star measurements. We got the moon. We got the night land measurements. No, well, we got the numbers that I mentioned. I just don't remember all of them. I did not get any cloud illumination with lightning. I did get day land measurements. I got the Ascension calibration. I got an IR cloud blanket sweep, but I did not get the cumulus clouds. CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 238 of NASA-UAP-D020, as released by war.gov
Image from page 238 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part II, 1965" (NASA-UAP-D020). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D020_Gemini-5-Technical-Debriefing_Part2_1965.pdf. Declassified UAP, page 238, https://declassifieduap.org/r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965/p/238. Accessed November 28, 2026.

This address shows page 238 on its own; /r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965?page=238 opens the same page in the full reader. Both stay. How to cite.