NASA-UAP-D020

Gemini 5 Technical Debriefing, Part II, 1965, page 237

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
237 of 325
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 237

226 CONFIDENTIAL It's on the recorder. At 06 days, 08 hours, 44 minutes, 40 seconds I did a 418 which was mountains. Those were desert mountains in East Africa. Again I got some record time. On the seventh day, 09 hundred hours, 00 minutes, 00 seconds 419 I got the Ascension calibration except it was done in drifting flight over Carnarvon if I'm not mistaken. And that is the end of D-4/D-7. Updating techniques and communications procedures were exactly the same as covered. Equipment set up and usage was very straightforward. The checkoff list was good. The cooled spectrometer checks worked out fine over Carnarvon. We had a go the first time. We never did make the alinements. The only thing we looked at with the cooled spectrometer was the REP. The REP measurements were made 1 hour and 50 minutes after liftoff. We had a go at Carnarvon. I went to PROP GAGE -EXPERIMENTS, RAD-1, Cola IR-ON, IR-ON, power-ON, transmitter ON, recorder-OFF. Shortly thereafter we had trouble with the scanner. At 2:05 we were still having trouble with the scanner. We were having trouble with the platform aline. We were in the process -CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 237 of NASA-UAP-D020, as released by war.gov
Image from page 237 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part II, 1965" (NASA-UAP-D020). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D020_Gemini-5-Technical-Debriefing_Part2_1965.pdf. Declassified UAP, page 237, https://declassifieduap.org/r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965/p/237. Accessed November 28, 2026.

This address shows page 237 on its own; /r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965?page=237 opens the same page in the full reader. Both stay. How to cite.