NASA-UAP-D018

Gemini 4 Experiment Debriefing, 1967, page 13

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
13 of 224
Agency
NASA
Released
Release 03, June 12, 2026

Archive note war.gov's title says 1967, the date of the transcription. Gemini 4 flew June 3-7, 1965, which is the date shown here. See all corrections

Text of page 13

M-931-65-04 LAUNCH VEHICLE DESCRIPTION The Gemini Launch Vehicle (GLV) has been modified by man-rating an Air Force Titan Il missile. The GLV has two stages, the first 71 feet long and the second 18 feet long; both stages have a diameter of 10 feet. The gross loaded weight of the two stages is 337,521 pounds and they both burn storable hypergolic (self-igniting upon mixture propellants. First stage thrust is approximately 430, 000 pounds at sea level. Second stage thrust is approximately 100,000 pounds. The various systems of the GLV have been detailed in previous Gemini MOR's and what follows is additional information concerning modifications made to GLV-4. The fuel dampener and oxidizer standpipe used to suppress longitudinal oscillations have been redesigned. Butt welding vice lapped joints have been utilized on the fuel tank conduits to eliminate minute cracks. Malfunction Detection System circuitry has been redesigned to provide separate indications of the subassembly thrust level and additional insulation has been applied to provide increased fire protection. Sixteen T/M readout points have been removed from the GLV because they are no longer required and one range safety circuit has been added to the destruct system interlocking AGE and the GLV motor driven switch control. This circuit will prevent switch cycling in the event that both set and reset signals are inadvertently applied during checkout. TABLE I PROJECT COST (In Millions) FY 62 FY 63 FY 64 FY 65 FY 66 FY 67 Total Spacecraft 30.3 Launch Vehicle 24.4 205.1 79.1 280.5 165.3 122.7 19.1 823.0 122.7 115.4 88.6 8.5 438.7 Operational Support Total RD & O 54.8 4.9 289.1 15.7 418.9 27.7 30.8 13.0 92.2 308.4 242.1 40.6 1353.9 This level of funding will provide for twelve Gemini Launch Vehicles, twelve space- craft, seven Agena Target Vehicles, six Atlas booster missiles and the operational costs of flight testing and the associated Ground Support Equipment. SPACECRAFT The spacecraft is 18.75 feet long and its two sections, a reentry module and an adapter section will weigh 7799 Ibs. fully loaded with the astronauts onboard. The configuration will be the same as was flown on GT-3 except for the following: minor changes have been made to switch positions and nomenclature, three additional (total of six) adapter 5/24/65 Page 3

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 13 of NASA-UAP-D018, as released by war.gov
Image from page 13 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 4 Experiment Debriefing, 1967" (NASA-UAP-D018). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D018_Gemini-4_Experiment-Debriefing_1967.pdf. Declassified UAP, page 13, https://declassifieduap.org/r/nasa-uap-d018gemini-4-experiment-debriefing-1967/p/13. Accessed November 28, 2026.

This address shows page 13 on its own; /r/nasa-uap-d018gemini-4-experiment-debriefing-1967?page=13 opens the same page in the full reader. Both stay. How to cite.