DOW-UAP-D168

BAASS Project Management Plan, December 2008, page 7

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
7 of 49
Agency
Department of War
Released
Release 07, October 23, 2026

Text of page 7

SUMMARY This Project Manager Report (PMR) fulfills the requirement to submit a report as part of the Advanced Aerospace Weapon System Application contract HHM402-08-C-0072. The report comprises overview projects that are focused on and include the scope of the final report (due in September 2009) for the twelve following areas: (1) Lift, (2) Propulsion, (3) control, (4) Power Generation, (5) Spatial/Temporal Translation, (6) Materials, (7) Configuration/Structure, (8) Signature Reduction (Optical/IR/RF/Acoustic), (9)Human Interface, (10) Human effects, (11) Armament (RF and DEW), and (12) Other areas in support of 1-11. The PMR addresses a Plan of Action, Milestones and the composition of BAASS analytical teams for these twelve technical areas. In numerous places throughout the EarthTech report previously mentioned, AAP Person 57 and others refer to the need for "examining more exotic possibilities that might account for reports of truly anomalous characteristics of high- performance craft of unknown origin whose mode of operation appears to be well advanced beyond that presently known." With that in mind, we present the Plans of Action and Milestones in this report comprising nine separate major projects which collectively address all twelve of the technical areas. It should be emphasized that for each of the nine projects, we envisage extension and expansion into 2010 and 2011. Accordingly, the milestones for each of the nine projects described herein should include extensions into 2010, 2011 and beyond. Page 1 This information is proprietary and confidential and cannot be disseminated or used without prior written consent from the Operating Manager of BAASS®.

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 7 of DOW-UAP-D168, as released by war.gov
Image from page 7 of the PDF. Open the scan to see the whole page.

Cite this page

U.S. Department of War. "BAASS Project Management Plan, December 2008" (DOW-UAP-D168). PURSUE Release 07, U.S. Department of War, October 23, 2026. https://www.war.gov/medialink/ufo/release-07/documents/DOW-UAP-D168-BAASS_Project_Management_Plan-December_2008.pdf. Declassified UAP, page 7, https://declassifieduap.org/r/dow-uap-d168-baass-project-management-plan-december-2008/p/7. Accessed November 28, 2026.

This address shows page 7 on its own; /r/dow-uap-d168-baass-project-management-plan-december-2008?page=7 opens the same page in the full reader. Both stay. How to cite.