DOW-UAP-D168

BAASS Project Management Plan, December 2008, page 15

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
15 of 49
Agency
Department of War
Released
Release 07, October 23, 2026

Text of page 15

congressional briefings by the Congressional Research Service [13]." Note: numbers inside parentheses refer to references in the Earthtech report #7. In order to meaningfully tackle the subject areas outlined in the above 12 technical topics, BAASS has been compelled to focus on those projects that are feasible given the current timelines and budget allocations for this contract. The three sets of papers that have been submitted to the agency by MUFON, Earthtech and by AAP Person 8 covered an enormous number of possible directions as they sought to address the above 12 technical areas. BAASS personnel judged it impossible logistically to embrace all of the recommendations in these technical papers as reasonable achievables. Many of the projects could take greater than several decades to accomplish and possibly billions of dollars. Accordingly, BAASS has chosen eight specific projects to focus on during the first and second years of this contract. We consider that the probability of success of these nine projects within a 12 or 24 month time frame and within the allocated budgets is maximized. Therefore, the objectives, methodologies, milestones and team compositions for each of the nine projects are laid out in detail in the next section of this Project management Report. Very recently, DIA has mandated the creation of a ninth project, that we call Project Physics (see page 11), in which the current research in universities and research institutes on all twelve technical areas will be studied. It should be stated at the outset that we deliberately adopted the stance that the most productive way to learn the maximum about the twelve technical areas was to study craft that are already displaying novel behavior in the twelve technical areas. Hence, with the exception of the DIA mandated Project Physics (see page 11) BAASS's resources will not be devoted to studying the current "state of the art" of technology in our university system and research institutes. This latter approach could prove fruitless and waste significant time and money. Page 9 This information is proprietary and confidential and cannot be disseminated or used without prior written consent from the Operating Manager of BAASS®.

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 15 of DOW-UAP-D168, as released by war.gov
Image from page 15 of the PDF. Open the scan to see the whole page.

Cite this page

U.S. Department of War. "BAASS Project Management Plan, December 2008" (DOW-UAP-D168). PURSUE Release 07, U.S. Department of War, October 23, 2026. https://www.war.gov/medialink/ufo/release-07/documents/DOW-UAP-D168-BAASS_Project_Management_Plan-December_2008.pdf. Declassified UAP, page 15, https://declassifieduap.org/r/dow-uap-d168-baass-project-management-plan-december-2008/p/15. Accessed November 28, 2026.

This address shows page 15 on its own; /r/dow-uap-d168-baass-project-management-plan-december-2008?page=15 opens the same page in the full reader. Both stay. How to cite.