DOW-UAP-D166

MUFON Reports Prepared for BAASS, November 2008, page 9

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
9 of 26
Agency
Department of War
Released
Release 07, October 23, 2026

Text of page 9

Referring to Figure 1, when (1843(a)(2) allowed his electrolytic cells to increase in temperature from 20°C to 95°C, the power density increases from about 1 W/ccPd) to about 100 W/cc(Pd). This is a remarkable increase in power density for just a 75°C increase in temperature. 1843(a)(2) While molten salt experiments were very difficult to replicate, he measured about 640 W/cc(Pd) at 450°C. 1843(a)(2) The experiment that is critical, however, is the "1 Cubic Centimeter - Ignition" experiment that went awry in 1985. were using a 1 centimeter cube of palladium as the cathode in an electrolytic cell that was operating at a controlled 20°C and producing about 1 watt of excess heat. Unaware of an impending electrolyte replenishing system failure, they left the cell operating unattended over a weekend 1843(a)(2) When they returned, the lab was a mess. Apparently, the cell had run dry so that the heat transfer coefficient from the Pd cube to its surroundings decreased from about 0.9 in the liquid to something closer to 0.1 in air. The few watts of heat being generated was more than could be transferred to the air and positive temperature feedback occurred. The temperature rose as did the fusion reaction rate and the cube of Pd melted its way free of the test apparatus. The Pd temperature was driven to its melting point of 1554°C and part of the palladium vaporized. In addition, the heat from the Pd cube vaporized a hole in the marble-like lab table and created a depression in the floor by vaporizing the concrete. It was apparent that the high intensity reaction had endured for an extended period of time. There is little doubt that high-density heat had been produced at high temperature. ] thought they had achieved "ignition" and they warned their colleagues never to let that happen to This was the first split in the road to practical applications that was missed! later conducted controlled 'boil dry' experiments using palladium rod of varying diameters and experienced the same acceleration of the fusion reaction rate into the high-density range when the electrolysis was stopped. This was another split in the road that was missed! Figure 1 suggests that: (1) operating temperatures in excess of 500°C are required to enter into the 'high density heat' range and (2) the continuous flow of electric power is not required to accelerate the reaction rate. 1843(a)(2) an the conditions that existed when produced 'high density heat' be replicated? The main thrust should be to design and construct a new fusion reactor based on a 'gas loading' principle rather than 'electrolytic loading'. With gas loading, the system temperature limitation is no longer the boiling temperature of the heavy water electrolyte but rather the strength of the pressure vessel that contains the fusion reaction. By choosing a space-age alloy with high strength at high temperatures, it is possible to create the conditions that existed when high-density heat was produced in the past. 1so, with the ability to maintain high Dz gas pressures at high temperature, it makes it possible t naintain system energy levels well above those threshold levels apparent from electrolytic experiments thi produced fusion heat. The key variables to control are the concentration of deuterium D/Pd ratio), the deuterium gas pressure and the temperature. Fortunately, from the interpolation and extrapolation of data from other sources, an equilibrium diagram can be produced and is shown as Figure 2. Page 3 of 7 BAASS CONFIDENTIAL Nov-08

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 9 of DOW-UAP-D166, as released by war.gov
Image from page 9 of the PDF. Open the scan to see the whole page.

Cite this page

U.S. Department of War. "MUFON Reports Prepared for BAASS, November 2008" (DOW-UAP-D166). PURSUE Release 07, U.S. Department of War, October 23, 2026. https://www.war.gov/medialink/ufo/release-07/documents/DOW-UAP-D166-MUFON-Reports_Prepared_for_BAASS-November_2008.pdf. Declassified UAP, page 9, https://declassifieduap.org/r/dow-uap-d166-mufon-reports-prepared-for-baass-november-2008/p/9. Accessed November 28, 2026.

This address shows page 9 on its own; /r/dow-uap-d166-mufon-reports-prepared-for-baass-november-2008?page=9 opens the same page in the full reader. Both stay. How to cite.