Text of page 77
Cops. to A.Liccardi,
DRAFT - expedive!
Ready for final
Frandsen, Eldon Hall
3/3766
Memo to Will Foster
From: J. R. Gill
Subject: Status of ARuXid Scientific (OSSA) Experiments on Gemini IX
The following scientific experiments are scheduled for Gemini IX: S-1,
Zodiacal Light Photography; S-10, Micrometeorite Collection on Agena;
Horizon
S-11, Airglow/Photography; s-12, Micrometeorite Collection on Gemini, related
to S-10; and Dim Light Photography being presented to SSSC as S-28 on
Friday,March 4,1966. (L. Dunkelman, GSFC).
S-1: Zodiacal Light Photography,E. Ney, Univ. of Minn.
Astronaut briefing, Ney reports that one briefing has been held in
Houston and another will be scheduled for the Planetarium. Elliott See,
Chas. Bassett and James vell were present or the first briefing: Tom
Stafford was not. Under the circumstances, it is likely that the briefing
Equipment, The camera equipment is now at the Cape. Documentation has
presented some problems, mainly the insistence on a new serial number for the
canera since it now has a handle on it. The handle is mounted with holes on
the camera. Tri- film will be used with and without the window (moopoti).
With hatch open and using the spacecraft as an occulting disk, the astronaut
will place himself in the shadow of the S?C and see how far out he can trace
the extension of the solar corona. He will also take 4 pictures of the airglow
and a picture of the milky Way.
The principal investigator commented that he yas very pleased with the
enthusiastic reception from See and Bassett for the equipment and experiment.
They have been the most interested in this experiment of all the astronauts who
have been associated with it.
in the experimental program, I personally have confidence th t he will pick up
where See and bassett have left off, and that the experiment can go off as planned.
S-10: Micrometeorite Collection on Agena. It employs the same bracket as S-12.
This modus operandi has cost more than a new design and has given much trouble.
GBI (govt serve inspection) has been a problem since it was not written into the
contract.
The problem is with thef iring with the handle in the open position.
Lubrication has also been a problem since the contractor has applied it in
"glops" instead of following instructions. The experiment is all ready, so
far as equipment is concerned.