Text of page 70
-
-
2
A now bracket, satisfactory to both uSC and the experimenter, has
been constructed at the Naval Research Laboratory.
This new
bracket was seen at the meeting in St. Louls, is Incorporated in
the training unit, and MSC is well satisfied
with it.
There is just one night pass for accomplishment on Gemini IX In
view of extra operational considerations of S-11.
This will
make 1t possible to get 14 exposures and a sunrise period. This
1s not what Koomen, principal investigator, requested.
lie asked
for four (4) night
passes originally. Apparently, navigational
equipment will have to usurp this time on IX. S-ll is scheduled
for reflight on Gemini XI and XII.
S-10. 8-12:
Both units have been checked out and fit-checked with the S/C.
S-12 is opened from inside the cabin by an upper right-hand
toggle switen designed to prevent inadvertent activation.
Both
pieces of equipment will be fit-checked at the Cape and then
returned to the principal investigator at Dudley Observatory for
flight loading.
There 1s "clean room" space for Dr. Hemenway
at the Cape also.
On Gemini IX the first activity will be to activate the 8-12
which is done from inside the cabin.
The second activity will be
to open the S-10 microneteorite box on the Agena.
The S-10 box
is fastened to the Agena by a velero patch. (Just which Agena
will be approached is unknown at this time; S-10 was attached to
the Agena belonging to Gemini VIII; if all goes as planned there
will also be one on the Agena belonging to Gemini IX.
the SEDR
R460 is scheduled for May 2nd and Wayne Baton from MSC will be
there. After that the collection boxes will be returned to
Dudley for loading for flight.
According to the present plan the 3-12 collection box will be
retrieved first during the EVA planned for the first day of the
mission.
In summary, there are some eight (8) hours of experiments
(scientifie experiments are only part of the total complement)
scheduled for Gemini IX and there are only 4-1/2 hours in toto
available for experiments according to 0, Smistad, Experiments
office, MSC.
The final flight plan should be ready on the 18th and I have
requested a copy.
jocelyn R, Gill
Jocelyn R. 0111
Manned Fllght Experiments Office