NASA-UAP-D022

Gemini 9 Debriefing, 1966, page 68

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
68 of 78
Agency
NASA
Released
Release 03, June 12, 2026

Text of page 68

A new bracket, satisfactory to both MSC and the experimenter, has been constructed at the Waval Research Laboratory. This new bracket was seen at the meeting in St. Louis, is incorporated in the training unit, and MSC is well satisfied with it. There is just one night pass for accomplishment on Gemini IX in view of extra operational considerations of S-ll. This will make it possible to get 14 exposures and a sunrise period. This is not what Koomen, prineipal Investigator, requested. He asked for four (4) night passes originally. Apparently, navigational equipment will have to usurp this time on IX. S-ll is scheduled for reflight on Gemini XI and XII. S-10, S-12: Both units have been checked out and fit-checked with the S/C. S-12 is opened from inside the cabin by an upper right-hand toggle switch designed to prevent inadvertent activation. Both pieces of equipment will be fit-checked at the Cape and then returned to the prineipal investigator at Dudley Observatory for flight loading. There is "clean room" space for Dr. Hemenway at the Cape also. On Gemini IX the first activity will be to activate the S-12 which is done from inside the cabin. The second activity will be to open the S-10 micrometeorite box on the Agena. The S-10 box is fastened to the Agena by a velero patch, (Just which Agena will be approached is unknown at this time; S-10 was attached to the Agena belonging to Gemini VIII; 1f all goes as planned there will also be one on the Agena belonging to Gemini IX. The SEDR H460 is scheduled for May 2nd and Wayne Eaton from MSC will be there. After that the collection boxes will be returned to Dudley for loading for flight. According to the present plan the S-12 collection box will be retrieved first during the EVA planned for the first day of the mission. In summary, there are some eight (8) hours of experiments (scientific experiments are only part of the total complement) scheduled for Gemini IX and there are only 4-1/2 hours in toto available for experiments according to 0. Smistad, Experiments office, MSC. The final flight plan should be ready on the 18th and I have requested a copy. CC : Jocelyn R. Gill Jocelyn R. G111 Manned Plight Experiments Office SM/Foster/Calio SM Subject Files: GT-9 S-1, S-12, S-11 SM Reading Files

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 68 of NASA-UAP-D022, as released by war.gov
Image from page 68 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 9 Debriefing, 1966" (NASA-UAP-D022). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D022_Gemini-9-Debriefing_1966.pdf. Declassified UAP, page 68, https://declassifieduap.org/r/nasa-uap-d022gemini-9-debriefing-1966/p/68. Accessed November 28, 2026.

This address shows page 68 on its own; /r/nasa-uap-d022gemini-9-debriefing-1966?page=68 opens the same page in the full reader. Both stay. How to cite.