Text of page 43
OPTIONAL FORM NO. 10
MAY 1962 EDITION
GSA FPMR (41 CFR) 101-11.6
UNITED STATES GOVERNMENT
Memorandum
Kartile
TO
SM/Director, Manned Flight Experiments Office
DATE: June 6, 1966
FROM : SM/Manned Flight Experiments Office
SUBJECT: Scientific Experiments carried out on Gemini IX
The Gemini IX mission carried the following OSSA experiments:
S-10 Agena Micrometeorite Collection
S-11 Airglow Horizon Photography
S-12 Gemini Micrometeorite Collection
In spite of a slight flurry last Friday night to throw in additional
experiments as a possible backup in the event of failure of the ATDA,
no new experiments were introduced. This was a consequence of the
decision to introduce no additional film packs which could have
accommodated some more experimental activity. (Ref. IWX to Dr.
John Clark re S-28 support for Gemini IX, 5/27/66 and IWX to 4
experimenters and their directors re S-5, S-6, S-28 and S-29, 5/31/66).
Nonetheless, it is anticipated that some photographs will have been
taken for S-5 and S-6 (Synoptic Photography) on the operational film
carried--even though this experiment was not scheduled for Gemini IX.
As of Sunday,
June 5th at 11:30 e.d.t. telephone contact with
Norman Foster's office indicated the following on experiments.
(Talked with Ed Zeitler, MSC both Saturday and Sunday. He is the
editor on the experiments status report).
The efforts to dislodge the shroud from the ATDA, (called by
Tom Stafford as "an angry alligator,") were in vain so docking with
the AIDA was scrubbed from the mission. At this point there was
some concern over the fuel supply and a thought that it might not be
possible to carry out all the experiments. The status of scientific
experimental activity is given below.
1.
S-10, Agena Micrometeorite Collection, Dr. C. Hemenway, Dudley
Observatory
The S-10 was carried on the ATDA, but it was impossible to get
near it or to retrieve it. The S-10 was also carried on the Agena
and there was no activity with it either. The S-10 is still on the
ATDA and conceivably could be retrieved on a later mission.
Wes
5010-108
Buy U.S. Savings Bonds Regularly on the Payroll Savings Plan