NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 92

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
92 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 92

82 Borman Lovell The temperature varied with the suits on and the suits off operation. I have gone through my notes here, and I note that it says when we both had suits on and we were just barely cool enough with both suits on and the B pumps run- ning. On the other hand, when we were both out of the suits, the B pumps only running, we were very comfortable. When we were up working and operating, we noticed that the temp- erature level in the cockpit was just right. We were run- ning most of the time with the suits full cold, the heat exchanger full cold, and maximm air flow on both controls. Then for several days when we went to bed, we left the con- trols that way, and we would wake up very cool. Well, there are several factors. I think the size of the Gemini cockpit and the fact of a completely closed 10op system is very dependent on 2 factors. One was the heat output of the people and two was the amount of heat you get in through the windows due to the sun. At night our heat output decreased, we put up shields on the windows, includ- ing some aluminized foil to reflect the sun, and I think the combination of both these things with the systems we had during the day time really dropped the heat in the cockpit. Then, during the day when we were active and had the windows open again, the temperature increased Inside the cockpit so

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 92 of NASA-UAP-D021, as released by war.gov
Image from page 92 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 92, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/92. Accessed November 28, 2026.

This address shows page 92 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=92 opens the same page in the full reader. Both stay. How to cite.