NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 89

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
89 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 89

Lovell Borman 79 sors. They were mounted with the inlet on the outside wall near the individual crewmans outboard knee. The suit inlet hose was then positioned to secure different flow patterns. Because no provision had been made for special inlet hoses, only two positions were tried. The one most often used was the suit inlet hose located near the inboard shoulder point- Ing forward. This produced a flow pattern from right to left down across the body. The body was never really in the flow but a very comfortable circulation pattern was set up. The other primary pattern consisted of leaving the suit out- let hose in the same place, but putting the inlet hose near the outboard knee, pointing 90° fron the direction of the outlet hose. This pattern also produced a comfortable flow pattern. In truth, I believe the cabin is so small in volume compared to the amount of air introduced by the suit circuit that almost any arrangement would provide enough air to provide efficient cooling. We also have some sketch- es of how this went. We also believe, after spending several days without suits on that the theory that at zero g there would be no con- vection cooling... I an sure that there isn't any, due to change in the heating condition. CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 89 of NASA-UAP-D021, as released by war.gov
Image from page 89 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 89, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/89. Accessed November 28, 2026.

This address shows page 89 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=89 opens the same page in the full reader. Both stay. How to cite.