NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 87

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
87 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 87

77 during tape dumps. We had no evidence of CO2• Comfort in any pressure suit is compromised. It restricts mobility and the Gemini cockpit is just not that big for long dura- tion flights where you can live with the suit. Suit con- trols were very adequate, no problems there. We had abso- lutely no problems with the O2 demand regulator. The eleo- trical umbilical is ungainly and heavy. The connection right angle sticks out in the cockpit. It could be better designed. We did not have fingertip lights. Our mode of operation, with the suit on, was primarily with the hood off, the cover visor on, and the gloves off. Many times we also unzipped the big zipper through the crotch and up the back, and left that zipper open. We found that the big opening in the neck, with the crotch zipper closed, most of the air would go out through the neck and would not adequate ly vent the lower stomach area. We had planned in our flight plan to try going suitless. As per plan, about the second day, I got out of wy suit and found after settling down to the environment that the skin became drier. There were no wet spots or dampness in the underwear area. I put my suit inlet hose along side of me on the center stowage area with the opening facing aft blowing air down alongside the seat blowing aft. The exhaust hose was put back into its stowage SONFIDENTLAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 87 of NASA-UAP-D021, as released by war.gov
Image from page 87 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 87, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/87. Accessed November 28, 2026.

This address shows page 87 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=87 opens the same page in the full reader. Both stay. How to cite.