NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 83

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
83 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 83

73 Borman Lovell Borman the flight plan. They gave us one minute and 16 or 17 sec- onds, and the flight plan called for 46, I think. Well, we may get that cleared up when we talk to the ground. But, it was greater than I thought we had planned to do. Updating throughout the flight was excellent. Checklist was fine and, of course, we did not use the computer. We might mention here that both Frank and I think making adjust maneuvers without a platform is very feasible. You can use the reticle for alignment and use the stars as a reference. Since you are usually using the aft thrusters, you do not have thruster light to worry about. You can turn down the lights. It takes two people though, one per- son to burn, hold attitude on the star, and watch the star reference and the other person to time. It required two people, but it is a very feasible method of doing it. I think you get some very good accuracies with it, because we found out from the second burn. 8.3 ROS RCS operational checks were nominal. We had no problems at all with the RCS. System monitoring was perfect and it did not drop one bit during the 14 days. After we actuated it, it went from 3,000 to about 2,600 to 2,500 psi on the source pressure. No problems. Control modes, RATE COMMAND. As I ONFIDEN T

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 83 of NASA-UAP-D021, as released by war.gov
Image from page 83 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 83, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/83. Accessed November 28, 2026.

This address shows page 83 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=83 opens the same page in the full reader. Both stay. How to cite.