NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 72

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
72 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 72

62 Lovell Borman Lovell Borman Lovell Borman FCSD Rep I wouldn't want to sit in there with our suits on. Plus, I thought the visibility of that suit during re- entry left a lot to be desired. That is why I had to pull my hood back to find out where we were and what position we were in. I think the suit is an excellent one, but it is going to have to be improved. We better grab it and start working, modifying it; to make it acceptable for Apollo. The sea condition was very good; 2 to 4 foot waves. We bobbed around, although I got a little queasy, I did not get nauseated, Jim didn't either. The sea condition was outstanding for landing. 7.6 Postlanding Activity Postlanding activity was well organized. We were a little busy. We did not get thru until about 10 o'clock that night. Is that right? Yes, that is right. We had a little misunderstanding about riding a bicycle. We understood we were not supposed to ride until 18 hours after impact. They wanted us to ride it that night after we had been through a full day of medical exams, and finally had a good supper. So, we told them they would have to hold off until 18 hours after impect. You are still in the spacecraft for this part. CON

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 72 of NASA-UAP-D021, as released by war.gov
Image from page 72 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 72, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/72. Accessed November 28, 2026.

This address shows page 72 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=72 opens the same page in the full reader. Both stay. How to cite.