NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 36

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
36 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 36

26 Lovell Borman Lovell Borman Borman INFDEN of 150 pol at launch. I called up Houston and said I would like to leave the gauge in the FCO, position rather then the ECS O2 position. Chris said, "No, unless we really felt strongly about it, they would rather have it In the ECS O2 position". So we left it there and after we were inserted and we were still with the booster, they came in with a recommendation that we open the cross feed. When we did, this immediately raised the pressure to 250 psi. The thing that was bad was that we had over 100% oxygen and we were down to about 100 lbs. on the FCO2' We agreed that we would fly at least 50 Ibs. above the dome. So, I really didn't see the need for opening that valve although it didn't cause any problems. They wanted to pump up and make sure. It worked fine and we got right back up to 250 lbs. That is one system that did work fine. The firet 7 hours was pretty nominal. All throughout the flight plan we have notes that the Delta P light went out and came back on and so on. At 16:40 we sighted a satellite much lower and on a slightly higher inclination path than we were. It passed underneath us. It was so far away it looked like a sighting from the earth. It was just a reflection. We were very religious about the exercise periods. We got ONFID

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 36 of NASA-UAP-D021, as released by war.gov
Image from page 36 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 36, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/36. Accessed November 28, 2026.

This address shows page 36 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=36 opens the same page in the full reader. Both stay. How to cite.