NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 34

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
34 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 34

24 Lovell Borman Lovell Borman Lovell Bormen Lovell Borman Lovell Borman As a matter of fact, why don't we get out the flight plan. I think we might have a lot of comments on 1t. Let's start from the beginning. The recorder was on at 27 minutes. D-4/D-7 measurements. The GET of measurement that the COLD IR was outside the two degree field of view of the booster was at 30:13. At 40:58 we had 84 % fuel left. We were right on the flight plan there. There was another GET of measurement where the spacecraft was lined outside the field of view of the booster at 38:00. We saw the booster for 2 or 3 revolutions after that. The lights were still working. We called it out and the ground got readings on this. The moon and booster were in view at 43:00. The booster and moon were in view and we might get an erroneous reading because we were almost on the moon. Here we have a note that at 2:32 the fuel cell Delta P light blinked off at 2 hours and 30 minutes and then came back on. That is the section 2 delta P light. Okay, then as far as stowage goes, the M-1 ouff was turned on at 3:03. We put the bypass hoses on at this time also the ECS bypass hoses. Incidentally, they turned out to be not too much of a problem. They were very handy for the type of

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 34 of NASA-UAP-D021, as released by war.gov
Image from page 34 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 34, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/34. Accessed November 28, 2026.

This address shows page 34 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=34 opens the same page in the full reader. Both stay. How to cite.