NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 28

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
28 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 28

18 Borman The sequence light test. This was done after the first orbit. We really had this insertion checklist in two phases, one at insertion and then one after D-4, D-7. 4.0 ORBITAL FLIGHT We have already discussed the station-keeping. That is no problem. I think the situation that we used, going off with about 2 seconds--2 to 3 seconds--and thrusting back with 5 seconds while you are still on your side getting back to the booster as quickly as possible,solves the problem and takes a lot of the orbital mechanics out of the situation. I hope the film comes out. The one thing that did make it a little difficult on this one is when we looked back, we were looking back into the sun, and the booster was right in line with the sun. It was just like flying formation when the leader makes a turn, and you are down sun. It is dif- ficult to see, and I tried to move off to one side and swing around and look a little bit more to the north. I think it was north. I guess I was trying to look to the south where I could get the sun out of my line of sight. I also had a cut-off on the booster at station-keeping at 88% fuel, so that at 88% fuel we were already in darkness, al- though we had not reached the time for the D-4, D-7 separa- tion which was to ocour at00:25.I think it was about 00: 23 or -CONFI

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 28 of NASA-UAP-D021, as released by war.gov
Image from page 28 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 28, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/28. Accessed November 28, 2026.

This address shows page 28 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=28 opens the same page in the full reader. Both stay. How to cite.