NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 191

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
191 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 191

Borman Lovell Borman Lovell Borman ONe! ENTIAL 181 sure that in case something goes wrong with the thruster, they could utilize more fuel to keep that alignment. Right. Well, as it worked out, we came out all right, any- way. Because we just said we were not going to do anymore if we got to 5 per cent to 6 per cent. Then they came back and said that one time, I said, "Well, we're at 6 per cent," and they said, "we thought you would go ahead and go to 5 per cent." And this is an awful nebulous thinking• Besides the gauge is hard to read to that accuracy. That is right. Okay. We have already discussed, I think, the consumables on the fuel cells and the batteries. We turned off the squib batteries, about the 10th day. The fuel cell consumables were never a problem. Main battery voltage was never really high, I thought. I have been led to believe that 22.5 volts was sort of a minimum voltage for a battery. They were up about 23 or 22.8 in the early part of the flight, and they were down to about 22.6, I guess, towards the end of the flight. 13.4 Flight plan changes If there was a flight plan change, the only one that I know of, that we were not aware of, was the one of updating our perigee in the first burn. We thought we were going to burn it to 102. It came out we burned it to 120 and I'd like to NADENT

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 191 of NASA-UAP-D021, as released by war.gov
Image from page 191 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 191, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/191. Accessed November 28, 2026.

This address shows page 191 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=191 opens the same page in the full reader. Both stay. How to cite.