NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 178

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
178 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 178

168 Lovell Borman Lovell 11.12 Borman wires on your head and stringing down the back of your neck, and not expect to catch them on something in a small space- craft. Now, we found that we couldn't keep the helmet on. I kept it on for two days, but my head became extremely hot, and I was uncomfortable. So when I took it off I ripped all four of the leads off. And I think that the whole thing is extraneous anyway. I felt after 14 days I was perfectly capable to judge my own condition, and my own awareness, and my own degree of alertness I did not need that bunch of wires hanging on my head to tell me or to tell somebody on the ground how awake or how asleep I was. Inflight phonocardiogram, I have no comments because it was stuck on me at prelaunch, and it stayed on me during the entire flight. Well, did it bother you? Did you get any sensor problems? No. Bioassay body fluids (M-5) and calcium balance study (M-7) Urine samplings bags, well, actually the bags were pretty good. We had one break around the head. Marking was all right and stowage was fine. I might point out that the tracer accumulator we changed with no problem. The mixing bag was all right, but they left out the most important thing here, the condom device that we used to

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 178 of NASA-UAP-D021, as released by war.gov
Image from page 178 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 178, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/178. Accessed November 28, 2026.

This address shows page 178 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=178 opens the same page in the full reader. Both stay. How to cite.