NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 159

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
159 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 159

CONF 149 was fine, the stop watch was an excellent idea. The lighting on the sextant angle reading was too bright. It was a white bright light. Everytime you read the sextant out you lost your dark adaptation because we were looking at this white light. And all it had to be, since the spacecraft is dark anyway if you are looking at stars, is red, or dimmer light to read the angle out. The reticle was fine during the first part of the flight, and then for some reason it became a double image. I found out that I never used the reticle during the full Moon or even at half Moon I could see the dark lines without having to light up the reticle. One of the big things about the sextant, the mechanical aspects, was the fact that the light was not split 50-50 between the upper prism and the lower telescope. It was a 20-80 split and therefore one image would be bright and the other one dim. This was fine if you went from the start of the horizon where you would have a bright star and a dim horizon. You had a control, but if you went fron, say, two stars to measure the angle between two stars to check the align- ment of a sextant, (because the angles are already known) one star would be bright and the other star real dim if you got them within a certain angle of each other. But as soon as you got that other dim star, then the bright

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 159 of NASA-UAP-D021, as released by war.gov
Image from page 159 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 159, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/159. Accessed November 28, 2026.

This address shows page 159 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=159 opens the same page in the full reader. Both stay. How to cite.