NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 150

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
150 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 150

140 DI deploy was very nice. Lovell Main chute deploy, very enjoyable to watch. Borman During landing and recovery we had the S2F in sight before we ever hit the water. 11.0 EXPERIMENTS 11.1 Celestial, Space, and Terrestrial Radiometry (D-4/7) Borman I think we have more valuable data on D-4/D-7 than all the others put together. Lovell Right. Borman Updating techniques and communications procedures were excellent. Everything called up on D-4/D-7 was right on the money, including the time and pointing locations for the reentry vehicle. Lovell They did an outstanding job of giving us the right information onboard. Borman We were perfectly trained in equipment setup and usage. Jim didn't have a question about it. I think there was no problem at all. Lovell We got everything going. I hope that we got some good data. Borman Cooled Spectrometer checks were nominal. CONFIDENT

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 150 of NASA-UAP-D021, as released by war.gov
Image from page 150 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 150, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/150. Accessed November 28, 2026.

This address shows page 150 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=150 opens the same page in the full reader. Both stay. How to cite.