NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 111

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
111 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 111

Borman Borman ON 101 The MDT worked perfectly the entire flight. Computer modes, PRELAUNCH, ASCENT, CATCH-UP, RENDEZVOUS, REINTRY, were all perfect, no anomalies in any of those. 8.8 Crew Station Controls and displays. The sequential telelights operated exactly as programmed. At minus 2:56, they came on to the second. They all turned green when they were punched, no problems there. The event timer was used only intermittantly throughout the flight for timing, and for the last 20 minutes. It worked fine. The IVI's also worked exactly as planned. The Flight Director Indicator was again, a nomi- nal case. One slight difference between the simulator and the Flight Director Indicator in the spacecraft, was the little outer roll gimbal indicator in the simulator always came up to the top. I'd grown used to flying the reentries by using that as a lift vector. In the spacecraft when we got all set up for reentry, low and behold, the outer roll gimbal was down at the bottom, so I had to fly the reci- procal of it. But it was just a minor change and I ended up acclimating to it with no problem. I think it is just a function of how you happen to go through zero. If you go through zero just a little bit to one side, the gimbal goes to the top, and if you go through the other side, it goes to the bottom.

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 111 of NASA-UAP-D021, as released by war.gov
Image from page 111 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 111, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/111. Accessed November 28, 2026.

This address shows page 111 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=111 opens the same page in the full reader. Both stay. How to cite.