NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 108

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
108 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 108

98 Borman The onboard cues for monitoring the electrical system are adequate. We found out one thing in this flight, that is the Delta P lights really don't mean a lot. We had been told before the flight never to purge if you had a Delta P light. We ended up violating every single one of the car- dinal rules that we had. I think the thing to note about the entire electrical system was the fine work done on the ground. They came up with solutions. They evidently were running similar type cells at MAC, St. Louis, and they kept them working for longer than they should have. Fuel cell operation, as far as I was concerned, Section 1 was ideal. Section 1 maintained its share of the load the whole flight. Section 2, we lost stacks 2-A and 2-0 eventually, I believe on about the 12th day. I was a little concerned on the 13th day with the status of Section 1 because we had had a delta P light on Section 1 for the first time and we had been running almost 24 hours. But, the ground came through and read us up a technical report from St. Louis that explained the whole thing. It made me feel a lot easier when they did that. Rather than having the ground comment blindly on it, "the fuel cells are going to be good for 24 hours," I would like to get a

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 108 of NASA-UAP-D021, as released by war.gov
Image from page 108 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 108, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/108. Accessed November 28, 2026.

This address shows page 108 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=108 opens the same page in the full reader. Both stay. How to cite.