NASA-UAP-D021

Gemini 7 Technical Debriefing, 1965, page 105

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
105 of 222
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 105

Lovell Borman Borman Lovell Borman Lovell 95 with Spacecraft 6 in the air, I thought went very well. It posed no problems. Communications Controls and Switches- Voice Control Center, Audio modes, Keying and Antenna Selec- tion, were all nominal. We might mention in Sleep Configu- ration--we never used the Sleep switches because we had the situation where we pretended it was night and went to sleep every evening and the ground never called us. I don't think they ever violated that for the 14 days. They never called us during the sleep period. So that worked very well. Beacon Control was no problem. We didn't use the Reentry C-band Beacon until reentry. The IM controls, transmitter, and antenna again were no problem. It was operated just as advertised due to all instructions from the ground. 8.6 Electrical Now we have some interesting things to talk about. Well, we monitored the electrical system pretty closely. Yeah, I guess we did. The only thing we can say here is reiterate what we have probably said before. On lift-off we had delta P lights come on for fuel cells--both Sections. 1 blinked on and off several times and went off. 2 blinked on and off several times and stayed on through insertion and stayed on SONFIDE

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 105 of NASA-UAP-D021, as released by war.gov
Image from page 105 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 7 Technical Debriefing, 1965" (NASA-UAP-D021). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf. Declassified UAP, page 105, https://declassifieduap.org/r/nasa-uap-d021gemini-7-technical-debriefing-1965/p/105. Accessed November 28, 2026.

This address shows page 105 on its own; /r/nasa-uap-d021gemini-7-technical-debriefing-1965?page=105 opens the same page in the full reader. Both stay. How to cite.