NASA-UAP-D020

Gemini 5 Technical Debriefing, Part II, 1965, page 73

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
73 of 325
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 73

68 CONFIDENTIAL Cooper Conrad Cooper Conrad Cooper Conrad That's a drastic move to make, but just that one experience was just enough to convince me that if you can't 100 per cent trust everybody and the system isn't going to work, then you just don't dare trust it at all. I wouldn't even think of not flying again with that DCS circuit breaker ON. At least for reentry. At lease in crew You couldn't have hurt us any better than by sending that load up. Real-time transmitter, delayed-time transmitter, fine. Stand-by transmitter .... We were out of fuel on Ring A. And we had 4.9 and 4.6 left in Ring B. Which is good. It says that Ring A ran out sometime after Ring B came on, which says we went around the world 1 1/2 times and re-. entered on Ring A by itself. That's pretty impressive. 33 pounds of fuel .... It also shows you how much fuel we used in Ring B. We tested Ring B and turned it off and didn't turn it on until sometime less than 70,000 feet and turned it back off again at 30,000 feet so we used the majoritr of the fuel on RATE COMMAND in Ring B from 65 to 30 which says it probably fired continuously all the way down, CONFIDENTIAD

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 73 of NASA-UAP-D020, as released by war.gov
Image from page 73 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part II, 1965" (NASA-UAP-D020). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D020_Gemini-5-Technical-Debriefing_Part2_1965.pdf. Declassified UAP, page 73, https://declassifieduap.org/r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965/p/73. Accessed November 28, 2026.

This address shows page 73 on its own; /r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965?page=73 opens the same page in the full reader. Both stay. How to cite.