NASA-UAP-D020

Gemini 5 Technical Debriefing, Part II, 1965, page 69

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
69 of 325
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 69

64 FCSD Rep Cooper CONFIDENTIAL the .. • Secondary 0 2• Mine was open, Pete's was closed the whole flight. That's the way they stayed, just like for the check list. Never saw one quiver in either one of them the whole mission. Pressure stayed right? Pressure stayed right where it was on launch. COz partial pressure. The gauge was somewhat erratic and gave us two or three readings that we had Co, partial pressure, one of which we finally checked and found we did not have and so then we disbelieved the gauge...: After that, although it generally read down at zero. Coolant: Coolant loops worked real fine. ... we were running two coolant loops ON most of the time since we had fuel cells running. For 2 twenty-hour periods we had fuel cell, section 2 of the fuel cells shut off, and the coolant loops shut off. In one period of time we had circuit breaker pulled on coolant 100p .... number 1 coolant loop. Secondary cool- ant loop, then we were running on pump B and with bypass ON. Bypassing it around so we were heating before bringing the section 2 back on the line after long shut down period we bypassed the coolant loop, the secondary coolant loop, in order to warm -CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 69 of NASA-UAP-D020, as released by war.gov
Image from page 69 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part II, 1965" (NASA-UAP-D020). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D020_Gemini-5-Technical-Debriefing_Part2_1965.pdf. Declassified UAP, page 69, https://declassifieduap.org/r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965/p/69. Accessed November 28, 2026.

This address shows page 69 on its own; /r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965?page=69 opens the same page in the full reader. Both stay. How to cite.