NASA-UAP-D020

Gemini 5 Technical Debriefing, Part II, 1965, page 46

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
46 of 325
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 46

Conrad Cooper Conrad CONFIDENTIAL 41 down and coming to a null out there, it appeared to start moving somewhat at the same separation rate to the south of us slightly towards a trail position very slowly. We tracked it for a long time. We were track- ing it straight out and then all nf a sudden, it be- gan to loop around slightly to the left. It did something like I'a never seen before! I'd never seen this happen in the simulator, and it still doesn't seem quite feasible to us that this could ever happen. One possible answer, and it's related to something that we saw later in the flight, Gordo, where we alined the platform and had yaw error couple into roll. Might not this have given us bad steering in- formation as far as our radar needles were concerned if the scanner wasn't working properly? We didn't have the platform alined right. We went along 30 minutes, almost one-third of an orbit. If we didn't have an alined platform, that would start coupling up in some other axis like roll and we would be off in yaw. Then when we thought we were pointing at the pole, we really weren't. Maybe it dian't really drift behind us, maybe it stayed out on our wing. We must have put it out fairly well CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 46 of NASA-UAP-D020, as released by war.gov
Image from page 46 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part II, 1965" (NASA-UAP-D020). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D020_Gemini-5-Technical-Debriefing_Part2_1965.pdf. Declassified UAP, page 46, https://declassifieduap.org/r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965/p/46. Accessed November 28, 2026.

This address shows page 46 on its own; /r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965?page=46 opens the same page in the full reader. Both stay. How to cite.