NASA-UAP-D020

Gemini 5 Technical Debriefing, Part II, 1965, page 273

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
273 of 325
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 273

262 Cooper Conrad CONFIDENTIAL on the gage. Electrical--I don't think there was any problem on the electrical system. The problem was in the cryogenics rather than the electrical. I should say in the cryogenics and in the water product of the fuel cells. These were the limiting things rather than the electrical power we were using. As long as you could run the fuel cells there was no limit to the power you could pull off of them. Let's put that to bed right now. The GPO fluffed powering up those fuel cells after they'd been powered down. If our electrical probiems didn't do anything else, we got to cycle electrical loads all the way through the flight on those fuel cells. As far as I'm concerned, those fuel cells are flight proven. Every fuel cell in every spacecraft that goes off should carry the maximum load of RSS supply so that he has all the electrical power that he wants to use. He can run that pla:form, computer, or any combination of electrical gear that he wants anytime during the flight. The same shing with the experiments. You've got to have that platform. We kept pinching electrical power and pinching electrical power. I think we proved that the fuel cells can take CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 273 of NASA-UAP-D020, as released by war.gov
Image from page 273 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part II, 1965" (NASA-UAP-D020). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D020_Gemini-5-Technical-Debriefing_Part2_1965.pdf. Declassified UAP, page 273, https://declassifieduap.org/r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965/p/273. Accessed November 28, 2026.

This address shows page 273 on its own; /r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965?page=273 opens the same page in the full reader. Both stay. How to cite.