NASA-UAP-D020

Gemini 5 Technical Debriefing, Part II, 1965, page 245

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
245 of 325
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 245

234 Cooper Conrad Cooper CONFIDENTIAL vision tester and photometer and the first thing there on the photometer -- I got the first day measurement with the photometer which required a 31 degree sun angle and this was really -- had been given a loca- tion to put the sun on the -- Gordo's side of the instrument panel to assure that we had the right sun angle -- okay, we made that measurement:. We had the photometer in the window whenever we went by the S-8/D-13 target -- we got those measurements, but we didn't get the last day photometer measurement be- cause we were in drifting flight and didn't have the fuel to set it up. But I don't think the window changed. I don't either. Yeah, okay. Let' s see, the vision tester, I thought worked very well. No problem on it -- everything worked just as advertised and we did run it just as we had agreed to run it and was scheduled to run it. In fact, in- creased our numbers of runs on it later on. Every- thing went fine on it. I sure noticed a variance from day to day in our performance - back and forth, back and forth -- it would seem to me like we -- and I think this is probably a function of how much we CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 245 of NASA-UAP-D020, as released by war.gov
Image from page 245 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part II, 1965" (NASA-UAP-D020). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D020_Gemini-5-Technical-Debriefing_Part2_1965.pdf. Declassified UAP, page 245, https://declassifieduap.org/r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965/p/245. Accessed November 28, 2026.

This address shows page 245 on its own; /r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965?page=245 opens the same page in the full reader. Both stay. How to cite.