NASA-UAP-D020

Gemini 5 Technical Debriefing, Part II, 1965, page 221

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
221 of 325
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 221

210 CONFIDENTIAL 11.0 EXPERIMENTS 11.1 Visual definition of celestial objects (D-1, nearby object photography (D-2), and terrestrial features (D-6) Conrad Okay. D-1, mode 01. These are going to be real straightforward. D-l mode 01 was done in con- Cooper junction with D-4 and it was done photographing the moon. It was done as advertised at 01 days 16 hours 30 minutes, and we took the moon with magazine 11. We took 4 pictures at 1/30 of a sec- ond. We took the moon on magazine 9 at 1/60 of a second, 4 pictures. We took 4 pictures of the moon on magazine 10 at 1/125 of a second, and all at that time period or shortly thereafter 16:30. In the meantime, we were making the recording IR measurements of the moon, so we have 12 pictures of the moon on the three camera backs, 3 400 film, 3401 film, and 8443 film. That was sequence 3 with the Questar lens, visual acquisi- tion mode. Now, we did not track with the peri- scope. We found that the boresight was good enough, and we didn't want to screw anything up. So Gordo did all the tracking with the reticle. I think we have mentioned it before, but we might CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 221 of NASA-UAP-D020, as released by war.gov
Image from page 221 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part II, 1965" (NASA-UAP-D020). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D020_Gemini-5-Technical-Debriefing_Part2_1965.pdf. Declassified UAP, page 221, https://declassifieduap.org/r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965/p/221. Accessed November 28, 2026.

This address shows page 221 on its own; /r/nasa-uap-d020-gemini-5-technical-debriefing-part-ii-1965?page=221 opens the same page in the full reader. Both stay. How to cite.