NASA-UAP-D019

Gemini 5 Technical Debriefing, Part I, 1965, page 99

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
99 of 223
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 99

94 CONFIDENTIAL Conrad Cooper Conrad Cooper Conrad I don't believe that Platform Mode was holding the tolerances it was supposed to. It was drifting a full degree, and it was supposed to hold better than that. It is supposed to hold plus or minus half a degree. By drifting off in yaw a degree, it burned the whole time l degree off in yaw in the same direction. You see, that accounted for the sort of large out- of-plane number; it was like 0.8 foot yer second that we got in to the out of plane. Okay, then we had a D-4/D-7 at 17:42:00, a 410 B and a 407 over Carnarvon; and it was not done. That's right; we didn't have a reticle. Because the reticle pooped out. We thought the reticle had burned out. It wasn't until later on after we were going to fix the reticle by putting the auxiliary light in there that Gordo found that there was a short in the cord when the cord was stretched, and that the short wasn't in the cord when the cord wasn't stretched, and that the sight was okay. That reminds me of another thing. Right after we got airborne I went to use the little auxiliary light down here. It was in the CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 99 of NASA-UAP-D019, as released by war.gov
Image from page 99 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part I, 1965" (NASA-UAP-D019). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D019_Gemini-5-Technical-Debriefing_Part1_1965.pdf. Declassified UAP, page 99, https://declassifieduap.org/r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965/p/99. Accessed November 28, 2026.

This address shows page 99 on its own; /r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965?page=99 opens the same page in the full reader. Both stay. How to cite.