NASA-UAP-D019

Gemini 5 Technical Debriefing, Part I, 1965, page 84

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
84 of 223
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 84

Cooper Conrad Cooper CONFIDENTIAL 79 the light 2 or 3 times and he turned the heater off then it came on again. You know, for an hour's period of time and he never had the lights again. Now, this is another reason why I suspect this OAMS system--one of the biggest mistakes ever made--whoever recommended it on the ground to power down that OAMS heater to save electrical energy fouled our whole system because we started at this point time having RCS heater lights. I checked for 8 days throughout the flight and I could always get an RCS heater light. If I turned off that heater switch I'd have an RCS light come on every once in a while and so we left those RCS heaters on all the time. From one day and 14 hours the RCS heater were on the whole flight. You know they're auto. And the only heat when necessary, but every time we turned the heater off we wouldn't run for an hour or two that the light didn't come back on again and it would either be on ring A or ring B. And the temperature that we'd get on the gage when those lights would come back on was something in the order of about 60 degrees wasn't it? CONFIDENTIAL•

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 84 of NASA-UAP-D019, as released by war.gov
Image from page 84 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part I, 1965" (NASA-UAP-D019). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D019_Gemini-5-Technical-Debriefing_Part1_1965.pdf. Declassified UAP, page 84, https://declassifieduap.org/r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965/p/84. Accessed November 28, 2026.

This address shows page 84 on its own; /r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965?page=84 opens the same page in the full reader. Both stay. How to cite.