NASA-UAP-D019

Gemini 5 Technical Debriefing, Part I, 1965, page 65

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
65 of 223
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 65

60 Cooper Conrad Cooper Conrad Cooper Conrad Cooper Conrad CONFIDENTIAL But you did go back to the AUTO. Yeah. I put it back in AUTO, you know, and then I called them, I think it was on the tape and I think I told them, I said, the switch is on AUTO. We're okay. Don't worry about it and then right after that we got up to this 240 or so in there and we realized that something was wrong and the heater was out and I guess we told them--We told them at Carnarvon that the heater was out. Well, we checked at that time then on the ammeter on and off and on and off that on both manual and AUTO and it was obvious. And that's when we- And it was coming down so rapidly that it looked like very shortly thereafter we were going to have fuel cell stoppage. We were getting below 200 and falling pretty fast and we had a big discussion between ourselves and we just made up our mind to forget the REP. We felt we were really in trouble. So we elected at that point to start powering down because we knew that we were using fuel cells at a very high rate. And we secured the Platform and Radar and everything else. CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 65 of NASA-UAP-D019, as released by war.gov
Image from page 65 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part I, 1965" (NASA-UAP-D019). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D019_Gemini-5-Technical-Debriefing_Part1_1965.pdf. Declassified UAP, page 65, https://declassifieduap.org/r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965/p/65. Accessed November 28, 2026.

This address shows page 65 on its own; /r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965?page=65 opens the same page in the full reader. Both stay. How to cite.