NASA-UAP-D019

Gemini 5 Technical Debriefing, Part I, 1965, page 53

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
53 of 223
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 53

48 CONFIDENTIAL FCSD Rep Cooper Conrad This Perigee adjust. Did you do that in Rate-is that the one you did in Rate Command? Or is that the one you tried in PLAIFORM? Did that in PLATFORM and it worked fine on that one. Did that one in PLATFORM and it worked great, but then on some of these other burns we did I tried it in PLATFORM and it really didn't work well at all. That's why I rather suspect the PLATFORM thing. There's something wrong with it. I think it was better at some times than others. It was allowing a lot of drift. Okay, in the log book I have it at 50 minutes which is just prior to Carnarvon that I found the Fuel Cell O2 and H, Heater Circuit Breaker OFF. Now that--I found it off because they told us to heat the Hydrogen not the Oxygen, but the Hydrogen final- ly drilled down to the 220 and they wanted us to use the heater and I turned the heater on and I noticed that I didn't get any ammeter rise and so I looked at the circuit breaker panel ard the Circuit Breaker was OFF. So, now in retrospect seeing the O, ON which is on the same circuit breaker burned out, I'm sure that it blew when this thing burned out. CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 53 of NASA-UAP-D019, as released by war.gov
Image from page 53 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part I, 1965" (NASA-UAP-D019). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D019_Gemini-5-Technical-Debriefing_Part1_1965.pdf. Declassified UAP, page 53, https://declassifieduap.org/r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965/p/53. Accessed November 28, 2026.

This address shows page 53 on its own; /r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965?page=53 opens the same page in the full reader. Both stay. How to cite.