NASA-UAP-D019

Gemini 5 Technical Debriefing, Part I, 1965, page 44

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
44 of 223
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 44

Conrad Cooper Conrad Cooper Conrad Cooper CONFIDENTIAL 39 something was wired up wrong or something in it because it was not working right. We didn't really get a chance to evaluate it too well because we had trouble with it so we stopped using it and by the time we'd been able to do anything with it we had other problems, fuel problems and so forth. So we never did get back to using it again. Well, we had other control system problems which were overpowering, platform problem wise, but we did try one burn on the platform and it was a terrible mistake. The darn thing did not have the accuracy to really hold it and we got one foot per second in and out of plane there. Yeah. That was in those coeliptic. In one of those, that coeliptic burns and we made our other burns then on Rate Command and man, that Rate Command system is just beautiful. It holds that space- craft so tight that it can't vary. Yeah. We had a beautiful control system, I thought. When Gordo made any of the burns on the Rate Command or anything like that it really responded -- well. Rate Command has tremendous torqueing. Boy, it's strong and it's instantaneous and you can just stop it right on the money. Really good. •CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 44 of NASA-UAP-D019, as released by war.gov
Image from page 44 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part I, 1965" (NASA-UAP-D019). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D019_Gemini-5-Technical-Debriefing_Part1_1965.pdf. Declassified UAP, page 44, https://declassifieduap.org/r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965/p/44. Accessed November 28, 2026.

This address shows page 44 on its own; /r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965?page=44 opens the same page in the full reader. Both stay. How to cite.