NASA-UAP-D019

Gemini 5 Technical Debriefing, Part I, 1965, page 183

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
183 of 223
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 183

178 CONFIDENTIAL Cooper Conrad FCSD Rep Conrad Cooper Conrad FCSD Rep Conrad Cooper Conrad Cooper FCSD Rep Cooper Yes. There was no horizon. The black part of the ball was gone. It was gone for the rest of reentry. We lost it awful early. Do you remember a point, say 400 000 feet, at what pitch angle you were on the ball? 400 000 feet -- the trim hadn't begun to affect you too much and Gordo was at about 30 degrees. About 30 degrees. Yes. Yes. But he was still flying the spacecraft, just holding attitude there. Okay, how about when you hit the atmosphere? 280 k. At 280 K we were -- It seemed to me that' s when things started to steepen up. We started to really trim up. We were beginning to get g -- By the time we got to 280 K, we were at about 50 degrees pitch, roughly - 50 or 60 degrees on the ball. We were quite a way down. From there on, we were moving right on around on the ball. Were you able after retrofire to roll it up and put the horizon on the top of the window and hold that? Yes, on the ball, but we couldn't see the horizon. CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 183 of NASA-UAP-D019, as released by war.gov
Image from page 183 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part I, 1965" (NASA-UAP-D019). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D019_Gemini-5-Technical-Debriefing_Part1_1965.pdf. Declassified UAP, page 183, https://declassifieduap.org/r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965/p/183. Accessed November 28, 2026.

This address shows page 183 on its own; /r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965?page=183 opens the same page in the full reader. Both stay. How to cite.