NASA-UAP-D019

Gemini 5 Technical Debriefing, Part I, 1965, page 178

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
178 of 223
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 178

5.3 Cooper Conrad Cooper Conrad Cooper Conrad Cooper CONFIDENTIAL 173 REENTRY again, of course, and squib batteries. We were already on the RCS system, so we didn't have to bring them on, but I did bring on the other ring at that point. At the 256, we wanted to go platform to ORB RATE as late as possible, so we did that after we got TR-256 function light - the attitude indicator light -- and that showed we had all our clocks were in sync just perfectly. There wasn't a clock in the spacecraft that wasn't in sync. The TR was in sync with the event timer and they were in sync with our back-up watches. There was no doubt in our minds that everything in the TRS system was working right down the line and that we were working right down the line. We went to retro attitude punched the -- Went to retro attitude, set up the whole thing for the reentry, and at Tp-l - TR 1, SEP OAMS, SEP ELEC, SEP ADAP, four squibs on - At TR-30 seconds - Arm retro. We already had that. I've always made it a procedure to arm auto-retro at TR 5 seconds - Let' s see -- SEP OAMS, SEP ELEC, SEP ADAP -- we did a CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 178 of NASA-UAP-D019, as released by war.gov
Image from page 178 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part I, 1965" (NASA-UAP-D019). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D019_Gemini-5-Technical-Debriefing_Part1_1965.pdf. Declassified UAP, page 178, https://declassifieduap.org/r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965/p/178. Accessed November 28, 2026.

This address shows page 178 on its own; /r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965?page=178 opens the same page in the full reader. Both stay. How to cite.