NASA-UAP-D019

Gemini 5 Technical Debriefing, Part I, 1965, page 165

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
165 of 223
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 165

160 CONFIDENTIAL Cooper Conrad Cooper Conrad Cooper Conrad Cooper So they wanted to keep the platform warmed up also. So we went for some approximately 20 hours with the platform warm-running-up. In drifting flight. In drifting flight. So what we did-we caged the platform, brought it up to cage and then we just went to orbit rate. Left it in orbit rate and we caged it at a time when were just guessing pretty close to 0,0,0 and then went to orbit rate. Some 20 hours later drifting all around, -tumbling all over the sky,-all over the places- It was amazing how close the platform was. The platform was almost right on what cur attitude was after that many hours of orbital rate errors and drift etc. etc. added in to there and it still was a good relative attitude indicator I thought it was really good. In all three axis it stayed on. I was pretty surprised. I really thought that was quite good. That platform really behaved well and it really took a lot of abuse. Dif- ferent times we powered it up-in drift- did all kinds of things. You couldn't have mistreated it more if you tried. Alining the platform very straightforward. We alined it in BFF. First of all, we went right to CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 165 of NASA-UAP-D019, as released by war.gov
Image from page 165 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part I, 1965" (NASA-UAP-D019). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D019_Gemini-5-Technical-Debriefing_Part1_1965.pdf. Declassified UAP, page 165, https://declassifieduap.org/r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965/p/165. Accessed November 28, 2026.

This address shows page 165 on its own; /r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965?page=165 opens the same page in the full reader. Both stay. How to cite.