NASA-UAP-D019

Gemini 5 Technical Debriefing, Part I, 1965, page 155

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
155 of 223
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 155

150 Conrad Cooper Conrad CONFIDENTIAL bag would hold it in. Keep it from floating and then fasten the velcro upon the back of the maneuver controller. Now there was one thing that one green bag that I had originally had the REP plan stow in it. The REP plan was never taken out and I never took the bag off the wall. Then, the other green bag had the Poleroid light filter in. I took that light filter in and out so many times that the elastic on the top of the bag broke and the bag got completely frayed from my right leg rubbing agairst it. My pressure suit actually wore that cloth all through. You can see that on that bag that came out of there. So they didn't work at all. We kept all our food garbage and all that little sort of things in the silver food bags that we opened and when we filled one we would wrap it with tape and stow it down there until it was time for our daily housecleaning. I might add for stowage two items that we found were extremely important were rubber bands and tape. We actually ran out of tape on the eighth day pack- ing the last of the garbage. We used every bit of tape that we could lay our hands on. We took the tape off of the bags. CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 155 of NASA-UAP-D019, as released by war.gov
Image from page 155 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part I, 1965" (NASA-UAP-D019). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D019_Gemini-5-Technical-Debriefing_Part1_1965.pdf. Declassified UAP, page 155, https://declassifieduap.org/r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965/p/155. Accessed November 28, 2026.

This address shows page 155 on its own; /r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965?page=155 opens the same page in the full reader. Both stay. How to cite.