NASA-UAP-D019

Gemini 5 Technical Debriefing, Part I, 1965, page 106

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
106 of 223
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (Cape Kennedy, Florida) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 106

Conrad Cooper Conrad Cooper Conrad CONFIDENTIAL. 101 Then I have Platform to ORB Rate, Prelaunch, and horizon scan for some reason. Questar 01, 90 degrees left. We alined SEF at 13:10. Oh, that was these platform tests 1 and 2 that they wanted us to do. That's right. We were getting ready for another stateside pass, too. We installed the photometer, we did an S-8/D-13 pass at day 3, 13 hours 32 minutes at Laredo. Oh, let me make a comment right now on S-8/D-13. We were supposed to make a measurement, a window survey, of the window before day one and the last day. Okay, the window scan was done on l day 18 hours 26 minutes 00 seconds. That was the first window scan. A second window scan was never done because the last 3 days of the flight we were in drifting flight. This required a 30-degree sun angle on the window, and we never did have a control system back until we were on the RCS system. We weren't about to do any experiments on RCS fuel. That was right before retro. The second window scan, the one at the end of the flight, wasn't done. But CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 106 of NASA-UAP-D019, as released by war.gov
Image from page 106 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Gemini 5 Technical Debriefing, Part I, 1965" (NASA-UAP-D019). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D019_Gemini-5-Technical-Debriefing_Part1_1965.pdf. Declassified UAP, page 106, https://declassifieduap.org/r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965/p/106. Accessed November 28, 2026.

This address shows page 106 on its own; /r/nasa-uap-d019-gemini-5-technical-debriefing-part-i-1965?page=106 opens the same page in the full reader. Both stay. How to cite.