NASA-UAP-D017

Preliminary Gemini 4 Crew Debriefing, Part II, 1965, page 90

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
90 of 290
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (North Atlantic Ocean) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 90

84. CONEIDENTIAL McDivitt reading the way I wanted it. Ha, ha! The squib batteries--our electrical briefing I thought, was very good. Everything behaved just the way they told me. The squib batteries started out pretty high, around 27 or 28 volts, and they progressively decreased in voltage as we went through the mission. The main batteries--every time I checked them they always checked out at about 9• as far as the amps were concerned. The adapter batteries--I was glad we'd had the brief- ing on them because I realized that knees on the adapter batteries were in operation during the launch when we got a high reading on the left stack ammeter up around 27 or 28 amps, and we had a reading of around, I believe, 14 amps on the right one. I didn't alarm Jim with this information because it was still below my cut-off point of about 30 amps or so. I felt that it was due to the knees in the adapter batteries causing unequal loadings of the main batteries with respect to the adapter batteries. Hold it. I want to make some comments about the electrical system and the power as we used it. CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 90 of NASA-UAP-D017, as released by war.gov
Image from page 90 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Preliminary Gemini 4 Crew Debriefing, Part II, 1965" (NASA-UAP-D017). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D017_Preliminary-Gemini-4-Crew-Debriefing_Part2_1965.pdf. Declassified UAP, page 90, https://declassifieduap.org/r/nasa-uap-d017-preliminary-gemini-4-crew-debriefing-part-ii-1965/p/90. Accessed November 28, 2026.

This address shows page 90 on its own; /r/nasa-uap-d017-preliminary-gemini-4-crew-debriefing-part-ii-1965?page=90 opens the same page in the full reader. Both stay. How to cite.