NASA-UAP-D017

Preliminary Gemini 4 Crew Debriefing, Part II, 1965, page 62

One page of a U.S. government record released under PURSUE, shown on its own with its text. The record page has the whole document, its catalog details and the scan.

Page
62 of 290
Agency
NASA
Released
Release 03, June 12, 2026

Archive note The astronauts' observations in this debriefing were made in flight. war.gov's location (North Atlantic Ocean) is where the debriefing or recovery took place, so this archive files the record off Earth, with no map pin. See all corrections

Text of page 62

56 CONFIDENTIAZ White McDivitt White McDivitt White McDivitt White I think we jumped into something else. We were in secondary O2 system and we weren't on flow rate. The only time we had the flow rate on that was during reentry. The flow rate there was sat- isfactory. The pressure obviously was satisfac- tory, but we didn't check it at the end. The control-- we put an extra detent on that control. I think the control was a positive one and we were able to keep it in the detents where we wanted it. I had no problem there. Right, I think that the way it's rigged up now is excellent. We designed it. It had better be, ha, ha! Right. Okay, the CO, partial pressure. The gage has been discussed prior to this time.It stayed down satisfactorily. Yes, it never got off zero. Okay, the coolant— the radiator operation config- uration--I don't have the times in front of me right now that we went onto the radiator, but I think it was about 40 minutes. 40 minutes. We went on the radiator about 40 minutes and we -CONFIDENTIAL

Machine-read (OCR) from the scan by this archive; it can contain errors. The scan is the record.

Image from page 62 of NASA-UAP-D017, as released by war.gov
Image from page 62 of the PDF. Open the scan to see the whole page.

Cite this page

National Aeronautics and Space Administration. "Preliminary Gemini 4 Crew Debriefing, Part II, 1965" (NASA-UAP-D017). PURSUE Release 03, U.S. Department of War, June 12, 2026. https://www.war.gov/medialink/ufo/061226/release_03/documents/NASA-UAP-D017_Preliminary-Gemini-4-Crew-Debriefing_Part2_1965.pdf. Declassified UAP, page 62, https://declassifieduap.org/r/nasa-uap-d017-preliminary-gemini-4-crew-debriefing-part-ii-1965/p/62. Accessed November 28, 2026.

This address shows page 62 on its own; /r/nasa-uap-d017-preliminary-gemini-4-crew-debriefing-part-ii-1965?page=62 opens the same page in the full reader. Both stay. How to cite.